![]() Line 18 Platform | ||||||||||||||||
Chinese name | ||||||||||||||||
Simplified Chinese | 龙潭站 | |||||||||||||||
Traditional Chinese | 龍潭站 | |||||||||||||||
| ||||||||||||||||
General information | ||||||||||||||||
Location | Between Xinjiao Middle Road (新滘中路) and Taichong (台涌), Huazhou Subdistrict Haizhu District, Guangzhou, Guangdong China | |||||||||||||||
Coordinates | 23°04′59″N 113°20′08″E / 23.082919°N 113.335656°E | |||||||||||||||
Operated by | Guangzhou Metro Co. Ltd. | |||||||||||||||
Line(s) | Line 11
Line 18 | |||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Tracks | 6 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
Other information | ||||||||||||||||
Station code | 1131 1806 | |||||||||||||||
History | ||||||||||||||||
Opened | 28 September 2021 (Line 18) 28 December 2024 (Line 11) | |||||||||||||||
Previous names | Shiliugang (石榴岗), Haizhu Wetland (海珠湿地) | |||||||||||||||
Services | ||||||||||||||||
|
Longtan station (simplified Chinese: 龙潭站; traditional Chinese: 龍潭站; pinyin: Lóngtán Zhàn; Jyutping: lung4taam4 zaam6) is an interchange station between Line 11 and Line 18 of the Guangzhou Metro, located underground between Xinjiao Middle Road and Taichong in Guangzhou's Haizhu District.[1][2] It opened on 28 September 2021.[3] Line 11 started operations at this station on 28 December 2024.[4]
The rails for Line 11 at this station connects to the nearby Chisha Depot. Thus, this is the terminating station for Outer Circle Line 11 trains returning to the depot.
This station is called Shiliugang Station during planning. In June 2020, the Guangzhou Civil Affairs Bureau announced that the initial name of this station was named Haizhu Wetland Station.[5] In February 2021, the station name of this station was set as Longtan Station.[6]
G | Street level | Exits A, B, C, D, E, F, G |
L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Security Screening Facilities |
L2 11 Platforms |
Buffer Level | Station Equipment |
Platform 2 | ![]() | |
Island platform, doors will open on the left | ||
Platform 1 | 11 Outer Circle (Chisha) ![]() | |
Mezzanine | Transfer Passageway | Transfer passageway between Lines 11 & 18 |
L3 18 Platforms |
Bypass Track | ![]() |
Platform 3 | ![]() | |
Island platform, doors will open on the left | ||
Platform 4 | 18 towards Wanqingsha (Shaxi) ![]() | |
Bypass Track | 18 express service passing loop ![]() |
Exit letter | Gallery | Exit location | Nearby | ||
---|---|---|---|---|---|
A | ![]() |
Shiliugang Road | Xinjiao Road Middle (Longtan Subway Station) Public Bus Stop (Westbound) | ||
B | ![]() |
Xinjiao Road Middle | Xinjiao Road Middle (Longtan Subway Station) Public Bus Stop (Westbound), Longtan Village Archway Public Bus Stop (Westbound) | ||
C | ![]() |
Shiliugang Road | Longtan East Ring Street, Haizhu District Government Service Centre | ||
D | ![]() |
Xinjiao Road Middle | Guangzhou Haizhu National Wetland Park | ||
E | ![]() |
Shiliugang Road | |||
F | ![]() |
Shiliugang Road | Longtan Village Archway Public Bus Stop (Westbound) | ||
G | ![]() ![]() ![]() |
Shiliugang Road | Xinjiao Road Middle (Longtan Subway Station) Public Bus Stop (Eastbound), Guangzhou Haizhu National Wetland Park |
During the EIA announcement of Line 11, the proximity of the station to the Haizhu Wetland Park and the fact that two entrances and exits entered the planned land area of the wetland park caused concern among citizens and environmental groups.[7] In order to protect the environment of the wetland park, Line 11 cancelled the subway entrance on the sidewalk at the entrance of the wetland park in the follow-up plan.[8]
On 30 July 2024, the Line 11 station completed the "three rights" transfer.[9] On 28 December, the station was opened with the opening of Line 11, and the station became an interchange station.[10]